SEWP 25MW drivetrain conducts six-degree-of-freedom testing

date
13/11/2026
According to Shanghai Electric Wind Power Group, the drive train for its deep-sea 25MW offshore wind turbine recently completed final assembly and rolled off the production line at the Binhai base. The complete drive train system will be installed on the Binhai drive train test bench for six-degree-of-freedom coupled load testing. This is a key ground verification step before the prototype of this model is deployed offshore.