The second production line of the Jia Yuan Era high-performance copper foil project with an annual output of 25,000 tons has been put into operation.

date
22/04/2026
According to Jiayuan Technology, on April 22, the second production line of the first phase of the 50,000-ton high-performance copper foil project of Jiayuan Era with an annual output of 25,000 tons was put into operation. Jiayuan Era is a joint venture subsidiary established by Jiayuan Technology Holdings and Ningde Times jointly, with a total investment of 5.6 billion yuan, a planned land area of over 540,000 square meters, and a planned total capacity of 100,000 tons.