Xinji Energy: Two new coal power projects pass 168-hour trial operation.
Sina Finance reported on March 30th that XINJI Energy announced on March 30th that its two newly-built coal power projects have passed the 168-hour trial operation. The specific projects are the newly-built coal power project of Shangrao New Investment Power Generation Co., Ltd. and the newly-built coal power project of China Coal XINJI Power Generation Co., Ltd.
Latest
3 m ago

